Your expert guide for tunnelling and trenchless success.
Led by two-time CCNZ award winner. 40 years at the tunnel face. Fully independent
"Trenchless cost blowouts aren't bad luck. They're baked in at concept stage."
UNDERGROUND INTELLIGENCE
It isn't on site. It's at front end — when the right options were never on the table and the baseline was already too thin to defend.
You already know the pattern.
A scheme goes to tender with a method that "should work." Geotech is patchy, so the contractor prices the gap. ECI begins, redesign follows, the programme slips. A claim lands. Then another. Margin's gone before anyone has broken ground — and the next project carries the same scar tissue.
01
Narrow options
Opportunity left on the table at concept stage.
02
Fuzzy constructability
ECI bias drives redesign and delay.
03
Geotech baseline gaps
Patchy GI weakens cost confidence.
04
Slow optioneering
Margins compress, programmes slip.
05
Contract complexity
3910 / 3916 / NEC / FIDIC amplify claims and method risk.
This isn't a one-off. It's a structural gap in how trenchless work gets framed, scoped, and priced. The same five failure points show up project after project.
Every one of these is a margin-killer. Every one is fixable — but only if someone with a builder's instinct gets in early.
The tunnelling and trenchless market needs an independent specialist advisor — one who has actually built the work — sitting alongside owners and design teams before the design locks, framing options early, red-flagging the ground baseline, and pressure-testing the scheme before it goes to market.
THE NEED
Not an academic. Not a generalist. Not a contractor with skin in the bid. An independent voice with the scars to back the call.
THE SOLUTION
HarkerWize. Built from the tunnel face up.
Forty years of hands-on tunnelling and trenchless delivery — now an independent advisor for the teams shaping the project. We're not bidding the work. We're making sure the work can be bid, built, and defended.
We plug in where influence is highest: pre-feasibility, concept, and the early design gates. We bring builder's instinct into owner teams and design teams across all trenchless methods — tunnelling, microtunnelling, pipe rehabilitation, HDD, guided boring, shaft construction.
PILLAR 01
Feasibility & Strategy
Make the right call before the design locks.
PILLAR 02
Design & Planning Support
Embed buildability before it's expensive to add.
PILLAR 03
Procurement & Delivery
Buy the right capability. Hold the contract together.
PILLAR 04
Digital Access & Project Intelligence
Decision-support products. See spotlight below ↓
"We simplify the complex, so you can move forward with certainty."
Compatible with NZS 3910 / 3916, NEC and FIDIC. We work the way your project is already structured.
DIGITAL ACCESS
Three products. One purpose: faster, smarter decisions.
Tools that complement, not replace, expert advice. Built from forty years of project experience — codified, so your team can use it on demand.
Planner
Method shortlist, risk, cost, CO₂e — in an afternoon.
Monte Carlo
P10 / P50 / P90 numbers funders accept.
AI-Enabled Platform
Project knowledge, sourced and audit-ready, in Teams.
THE STAKES
Without HarkerWize
- Concept locks before trenchless options are properly explored.
- Ground baselines stay thin. Contractors price the gap.
- ECI eats the programme.
- Claims arrive. Margin disappears.
- Confidence in the scheme drops — and in the next one.
With HarkerWize
- Options surfaced early — including ones nobody saw.
- Risk-by-chainage mapped and red-flagged before tender.
- Constructability resolved at the gate where it costs least.
- Schemes go to market with cost confidence the funder accepts.
- Delivery runs cleaner. The team you trust grows.
Two paths. One choice.
THE CALL
If any of this sounds familiar, HarkerWize is the right call.
One conversation is usually enough to know whether we're a fit.
THE OUTCOME
- …move into delivery with options that were properly tested at concept stage.
- …defend baselines that hold under audit and contractor pressure.
- …remove months of programme risk before tender.
- …protect margin instead of chasing it through claims.
- …bring builder's instinct into the team — and the project feels the difference.
- …turn scattered project data into traceable, defensible answers in minutes, not weeks.
- …lead the whole-life carbon conversation instead of reacting to it.
- …show up at the design gate with options nobody else saw.
Because you use HarkerWize, you…
You stop firefighting trenchless risk. You start designing it out. That's the work. That's what HarkerWize is for.
Mike Harker · HarkerWize